# Laravel Queue Worker Graceful Shutdown: No Lost Jobs

> Stop and restart Laravel queue workers on deploy without losing or duplicating jobs. Covers queue:restart, SIGTERM, Supervisor stopwaitsecs, and Horizon.

Source: https://crontinel.com/blog/laravel-queue-worker-graceful-shutdown/

Deploying code while queue workers are running is one of the most common ways to lose jobs in production. You push a release, restart your process manager, and workers die mid-execution. The job is lost, or worse, it runs twice because the database transaction hadn't committed yet.

This guide covers how to configure graceful shutdown for Laravel queue workers so deployments never lose work.

## Why Workers Die During Deployments

When you deploy a new release, your process manager (Supervisor, systemd, or your hosting platform) typically does one of:

1. **SIGTERM the old worker** — the worker receives the signal and immediately exits
2. **SIGKILL** — the process is killed without cleanup
3. **New worker starts before old one finishes** — the old worker is orphaned

Laravel's `queue:work` command handles `SIGTERM` gracefully by default. It finishes the current job, then exits. But only if you configure it correctly.

## The Default Behavior (And Why It Breaks)

Run a queue worker without flags:

```bash
php artisan queue:work
```

This worker will:
- Process one job, then check for the next
- On `SIGTERM`, it finishes the current job and exits
- But it does **not** release the job if the process is killed with `SIGKILL`

The problem: most process managers send `SIGTERM` first, then `SIGKILL` after a timeout (usually 10 seconds). If your job takes longer than that timeout, the worker is killed mid-execution.

## Configure Graceful Shutdown

### 1. Set the `--timeout` Flag

The `--timeout` flag controls how long a worker waits before killing a job that's taking too long:

```bash
php artisan queue:work --timeout=60
```

This tells the worker: "If a job takes more than 60 seconds, kill it." But this doesn't control the worker's own shutdown behavior — it controls the *job's* timeout.

### 2. Set `SIGTERM` Handler in Your Worker

Laravel's `queue:work` command already handles `SIGTERM` — it finishes the current job and exits. The issue is when your process manager doesn't give it enough time.

### 3. Configure Supervisor for Graceful Shutdown

If you're using Supervisor, set `stopwaitsecs` to give workers time to finish:

```ini
[program:queue-worker]
command=php artisan queue:work --sleep=3 --tries=3 --timeout=60
process_name=%(program_name)s_%(process_num)02d
autostart=true
autorestart=true
stopwaitsecs=90
stopasgroup=true
killasgroup=true
```

Key settings:
- **`stopwaitsecs=90`** — Supervisor waits 90 seconds for the worker to exit after sending `SIGTERM`
- **`stopasgroup=true`** — sends `SIGTERM` to the entire process group (catches child processes)
- **`killasgroup=true`** — sends `SIGKILL` to the process group if `stopwaitsecs` expires

Without `stopwaitsecs`, Supervisor defaults to 10 seconds — too short for most jobs.

### 4. Configure Horizon for Graceful Shutdown

Horizon handles this differently. Horizon's supervisor process manages worker lifecycle:

```php
// config/horizon.php
'environments' => [
    'production' => [
        'supervisor-1' => [
            'connection' => 'redis',
            'queue' => ['default', 'emails', 'reports'],
            'balance' => 'auto',
            'autoScalingStrategy' => 'time',
            'maxProcesses' => 10,
            'maxTime' => 3600,
            'maxJobs' => 1000,
            'memory' => 128,
            'tries' => 3,
            'timeout' => 60,
            'nice' => 0,
        ],
    ],
],
```

Horizon workers respect the `--timeout` setting and handle `SIGTERM` by finishing the current job. But you still need to configure your process manager (Supervisor, systemd) with appropriate `stopwaitsecs`.

### 5. Use `queue:listen` as a Fallback

If you need absolute safety (every job must finish or be released), use `queue:listen` instead of `queue:work`:

```bash
php artisan queue:listen --timeout=60
```

`queue:listen` spawns a new process for each job. If the worker is killed, the job was either completed or never started — no partial execution. The downside: higher memory usage and slower job processing.

## Deploy-Time Strategy: The Two-Step Restart

The safest deployment pattern for queue workers:

```bash
# 1. Stop accepting new jobs
php artisan queue:work --once
# Or: kill the workers, wait for current jobs to finish

# 2. Deploy new code
git pull && composer install --no-dev

# 3. Start new workers
php artisan queue:work --sleep=3 --tries=3 --timeout=60
```

With Horizon, this is simpler:

```bash
# Horizon automatically restarts workers on config change
php artisan horizon:terminate
```

`horizon:terminate` sends `SIGTERM` to all workers, waits for them to finish their current job, then starts new workers with the updated code.

## The `--max-jobs` Safety Net

For extra safety, use `--max-jobs` to force workers to restart after processing a set number of jobs:

```bash
php artisan queue:work --max-jobs=500
```

This ensures workers periodically restart with fresh code and clear memory. Combined with `stopwaitsecs`, it gives you predictable shutdown behavior.

## Common Failure Modes

| Scenario | What Happens | Fix |
|---|---|---|
| Worker killed with `SIGKILL` | Job lost (or duplicated if DB transaction hadn't committed) | Use `stopwaitsecs` and `SIGTERM` handling |
| Worker timeout too short | Job killed before completion | Set `--timeout` higher than your longest job |
| Multiple workers on same queue | Race conditions, duplicate processing | Use `--uniqueJob` or Horizon's balancing |
| Redis connection drops during job | Job stuck in "processing" forever | Use `queue:restart` after Redis reconnects |
| Memory leak in long-running worker | Worker OOM-killed | Use `--max-jobs` or `--max-time` |

## Monitoring Shutdowns

Track graceful vs forced shutdowns in your logs:

```php
// In aServiceProvider::boot()
Queue::after(function (JobProcessed $event) {
    Log::info('Job completed', [
        'job' => $event->job->resolveName(),
        'queue' => $event->job->getQueue(),
    ]);
});
```

If you see jobs that start but never complete, your workers are being killed before they finish. Check your process manager's `stopwaitsecs` setting.

## Key Takeaway

The single most impactful change: **set `stopwaitsecs` in Supervisor (or equivalent) to at least 90 seconds**, and use `--timeout=60` on your queue workers. This gives workers enough time to finish any job before being killed, and ensures deployments never lose work.

With Crontinel, you get alerts when workers stop processing jobs — so if a deployment does go wrong, you know within seconds, not hours.

## Related reading

- [Laravel queue worker memory limits without restart loops](/blog/queue-worker-memory-limit/)